Skip to product information
1 of 9

Premium S-Curve Ergonomic Lash Bed

Premium S-Curve Ergonomic Lash Bed

Regular price €1.688,00 EUR
Regular price Sale price €1.688,00 EUR
Sale Sold out
Shipping calculated at checkout.
装饰品材质
Quantity
  • Ergonomic S-Curve Design
    S-shaped silhouette naturally follows the spine’s curvature, reducing pressure points and providing lasting comfort during long lash or brow sessions.
  • Smooth Hydraulic Height Adjustment
    Foot pedal controlled hydraulic system allows precise, stable height changes without interrupting your workflow. Combined with a full 360° swivel, you can access clients from any angle effortlessly.
  • Flexible Positioning
    Backrest reclines to a fully flat position (0–180°), easily transitioning from seated treatments to full lay-down services. Ideal for lash extensions, microblading, and facial treatments.
  • Premium Upholstery Choices
    Choose from three commercial-grade coverings: Velvet, Eco-Leather, and Plush Velvet. High-density cushioning provides firm support and soft rebound, designed for daily professional use.
  • Sturdy, Salon-Ready Build
    Durable stainless steel base ensures stable support with a load capacity of [填入] kg. Suitable for beauty salons, SPA centers, tattoo studios, and medical aesthetics clinics.
  • Arrives fully assembled. Free DDP shipping across the EU. 2-year warranty.
  • Free UPS delivery across Europe.
  • 14-Day Return Policy
  • 2-Year Warranty
View full details